The first room to have dry wall hung is the utility room.  You can see the electrical boxes on the right.  To the left, out of site is the area where all the hot water and in-floor heating stuff will go.  The plumbers will come in soon and add the boiler to make sure everything is working perfectly, and to dry out the house completely before the dry-wall is sealed.

The first room to have dry wall hung is the utility room. You can see the electrical boxes on the right. To the left, out of site is the area where all the hot water and in-floor heating stuff will go. The plumbers will come in soon and add the boiler to make sure everything is working perfectly, and to dry out the house completely before the dry-wall is sealed.